Wednesday I finished loading the steel plates and finish lumber and PT deckboards, and then picked up a large wad of rail making materials at the steel vendor.
I will tack the steel sheets to the trailer rails, wire brush them, and use my trailer as the welding table. I leveled it so I can use a square and level during the fabrication process.
I backed it into the carport where I I'll do all the fabrication on site and under cover.
Yesterday I spoke with the building inspector to see what I had to get done at a minimum. I was hoping to put off the siding patches I left off for accent wood, but no. I need to plan on that. I do get to leave all the soffits for now. That is big deal with the cantilevers and 24x24 carport.
I got a quote on the double check valve and Pressure Reducing Valve (PRV) required for my water connection next Wednesday.
I stopped by the local welding shop who stocks gasses for a vendor, and started gearing up for the welding work.
I will tack the steel sheets to the trailer rails, wire brush them, and use my trailer as the welding table. I leveled it so I can use a square and level during the fabrication process.
I backed it into the carport where I I'll do all the fabrication on site and under cover.
Yesterday I spoke with the building inspector to see what I had to get done at a minimum. I was hoping to put off the siding patches I left off for accent wood, but no. I need to plan on that. I do get to leave all the soffits for now. That is big deal with the cantilevers and 24x24 carport.
I got a quote on the double check valve and Pressure Reducing Valve (PRV) required for my water connection next Wednesday.
I stopped by the local welding shop who stocks gasses for a vendor, and started gearing up for the welding work.