thefed
Thinks s/he gets paid by the post
- Joined
- Oct 29, 2005
- Messages
- 2,203
well, house # has carpet and is livebale. The outside will be sided when i get time, and it'll be done
somehow i ended up with cheech, chong, and rainman doing my carpet. it looks great...but wow...what an experience!
house 2 is in stage 1....demolition. I've taken down a wall, ripped up some subfloors, and stripped wallpaper. (the subfloor gave me a reason to buy my favorite tool to date.... a ROTOZIP)
Im trying to hire a lot out on this one to get a FEEL FOR WHAT LEVEL OF WORK MAKES ME MOST COMFORTABLE....SO FAR, I HATE CONTRACTORS (sorry for caps...im not re-typing....damn this lil' laptop!!)
just thouhgt i'd keep y'all updated
and for anyone who remembers my post about starting duct cleaning business....well, i havent advertised in 4 months due to a lack of time (rehabs). I'm still working about 20 hrs/month doing it and averaging $100/hr after costs!
thanks for listening
somehow i ended up with cheech, chong, and rainman doing my carpet. it looks great...but wow...what an experience!
house 2 is in stage 1....demolition. I've taken down a wall, ripped up some subfloors, and stripped wallpaper. (the subfloor gave me a reason to buy my favorite tool to date.... a ROTOZIP)
Im trying to hire a lot out on this one to get a FEEL FOR WHAT LEVEL OF WORK MAKES ME MOST COMFORTABLE....SO FAR, I HATE CONTRACTORS (sorry for caps...im not re-typing....damn this lil' laptop!!)
just thouhgt i'd keep y'all updated
and for anyone who remembers my post about starting duct cleaning business....well, i havent advertised in 4 months due to a lack of time (rehabs). I'm still working about 20 hrs/month doing it and averaging $100/hr after costs!
thanks for listening