Hermit
Thinks s/he gets paid by the post
I have washed rock coming on Tuesday to get the basement ready to pour concrete. I am leveling the base to 12 inches below the final concrete floor. Leveling a decomposed granite grade is not easy. Surface varies from 2 inches high to 2 inches low. I'll be swinging a pick for the next couple of days. Then on to moving about 15 tons of rock. Maybe I can get a couple of kids to help with the rock.