Vincenzo Corleone
Full time employment: Posting here.
- Joined
- Jul 20, 2005
- Messages
- 617
Some of you may remember that I'm in the process of going through a bathroom renovation. We're near the end of the project and all that remains are to have the final inspections done and some minor punch list items to be completed.
This morning, I had a most bizarre telephone conversation with the GC regarding more work that my wife and I wanted him to do. During the conversation, the GC became hostile and confrontational when I insisted that we sign a contract prior to starting this new work. It was something out of the Twilight Zone. I was flabbergasted. I told him that I was sorry he felt the need to be confrontational and, at the end of the conversation, we agreed that he should just finish up the current project, pack up, and be on his way.
Because we have the final inspections and punch list items that are yet to be done, it would probably mean the GC will be in my home again - something I do not feel comfortable with considering the hostility he displayed this morning. I'm prepared to forego the items on the punch list, but we have the issue of the final inspections.
Any suggestions on how to proceed?
This morning, I had a most bizarre telephone conversation with the GC regarding more work that my wife and I wanted him to do. During the conversation, the GC became hostile and confrontational when I insisted that we sign a contract prior to starting this new work. It was something out of the Twilight Zone. I was flabbergasted. I told him that I was sorry he felt the need to be confrontational and, at the end of the conversation, we agreed that he should just finish up the current project, pack up, and be on his way.
Because we have the final inspections and punch list items that are yet to be done, it would probably mean the GC will be in my home again - something I do not feel comfortable with considering the hostility he displayed this morning. I'm prepared to forego the items on the punch list, but we have the issue of the final inspections.
Any suggestions on how to proceed?